background image

Annals of the Academy of Romanian Scientists 

Series on Science and Technology of Information 

Online ISSN 2066-

 

8562 

Volume 

19

, Number 2/

2026

 

33 

 

 

DESIGN OF AN INTEGRATED MONITORING SYSTEM  

FOR A FLOW-SHOP PRODUCTION LINE 

Ionuț

-Valentin CRISTEA

1

, Theodor BORANGIU

 2

, Silviu RĂILEANU

3

,  

Andrei Alexandru CRISTEA

 4

 

Abstract. 

The paper proposes an integrated monitoring system for a household-appliance 

flow-shop  line  with  17  zones  and  687  conveyors.  A  dedicated  edge  processing  zone 

separates multi-rate acquisition and condition analysis from automatic process control. 

The  design  combines  zone  agents,  redundant  supervision,  configuration-based  network 

sizing and independent monitoring services. An eight-hour simulation compares reactive 

and  alert-triggered  maintenance  under  four  matched  injected  degradations.  Finished 

output  rises  from  25  to  198  units  in  this  scenario.  The  comparison  demonstrates  the 

potential of early intervention, while metric-accounting limitations and the absence of field 

validation constrain its interpretation. A physical pilot is the next validation stage. 

Keywords: 

Flow-shop  production;  condition  monitoring;  edge  computing;  predictive 

maintenance; industrial simulation. 

 

DOI     

10.56082/annalsarsciinfo.2026.2.33

 

 

1.

 

Introduction 

In a conveyor-connected flow-shop organisation, the impact of a defect depends 

on its position in the material flow. A stopped conveyor can block upstream stations 

and starve downstream operations. Machine monitoring therefore needs a line-level 

view of product movement, equipment condition and maintenance priorities. This 

information must remain available without delaying the control tasks that sequence 

production. 

Condition-based  maintenance  connects  data  acquisition  and  processing  to 

decisions about necessary interventions [1]. Digital manufacturing architectures use 

mechanisms that integrate physical resources with software services and enterprise 

information [2]. For an existing assembly line, the design problem is to make these 

mechanisms  consistent  across  heterogeneous  stations  while  maintaining  the 

deterministic behaviour of the installed automation system. 

This paper develops a monitoring structure for 17 production zones, separating 

control  from  edge  processing  and linking  a  configuration-driven communication 

model to executable monitoring functions. The architectural design is evaluated by 

 

1

 Ph.D. student, POLITEHNICA Bucharest, ionut.cristea1507@stud.acs.upb.ro 

2

 University Professor, Ph.D., POLITEHNICA Bucharest, Academy of Romanian Scientists, 

theodor.borangiu@upb.ro 

3

 Associate Professor, Ph.D., POLITEHNICA Bucharest, silviu.raileanu@upb.ro 

4

 Ph.D. student, POLITEHNICA Bucharest, andrei.cristea2107@upb.ro 

background image

 
 

34 

Ionuț

-

Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA

 

 

 

help of a paired simulation experiment. The numerical results apply to the simulated 

scenario;  industrial  deployment  and  prognostic  accuracy  remain  subjects  for  the 

physical pilot development. 

2.

 

Material and method 

2.1.

 

The production line and monitoring requirements 

The studied case concerns a household-appliance assembly line with a nominal 

takt of 60 s, corresponding to one completed unit (final product) per minute under 

nominal operating conditions. Its 17 zones comprise 12 production stations, visual 

inspection,  long-duration  testing,  two  carrier-return  sections  and  the  finished-

product  warehouse.  The  transport  system  contains  687  conveyors.  The  product 

carriers travel in a closed loop, while approximately 7% of production enters a two-

hour test branch. Figure 1 presents the main and auxiliary routes of the line model. 

 

Figure 1. Production flow with auxiliary test and empty-carrier routes 

These  routes  generate  monitoring  requirements  beyond  station  alarms.  The 

product  identity  must  remain  linked  to  the  carrier,  test  verdict  and  processing 
history. The conveyor condition must be interpreted in the context of blocking and 
starvation  states.  The  acquisition  design  must  also  accommodate  dynamic  force 
signals during active compliant product assembling with robots, slowly changing 
temperatures and discrete product-test events within the same zone interface. 

The data acquisition configuration contains 67 distributed I/O islands and 2,296 

monitored signals. A zone is the individual unit of instrumentation deployment; its 
signal registry defines the sensors, IoT gateways and aggregation nodes, sampling 
policies, limits and asset identifiers needed by the common monitoring services. 

background image

 

 

 

 

Design of an Integrated Monitoring System for a Flow-Shop Production Line 

35

 

 

2.2.

 

Functional architecture and control separation 

The proposed monitoring architecture comprises seven functional layers L1-L7 

at each workstation as shown in Figure 2. These are data-specific equipment layers. 
They  are  not  fully  mapped  to  the  ISA-95  hierarchy:  manufacturing  execution 
(MES)  and  enterprise  planning  (ERP)  are  mainly  related  to  the  supervision  of 
operations and batch planning domains described in IEC 62264-1 [3], although both 
are fed with current product and resource data collected at monitoring time. 

 

Figure 2. Seven equipment layers with parallel control and product monitoring paths 

Distributed sensors feed I/O zones (IoT gateways) on L1, L2 layers. The PLC 

zone on L3 layer executes operation sequencing, actuating commands and inter-
locks based on collected process data, while the L4 edge aggregation node performs 
condition-data acquisition, alignment and preprocessing. The L5 industrial PC layer 
combines process context and product features (retrieved from L4) with control data 
and PLC status (retrieved from L3)  and exposes an OPC UA interface to the L6 
supervisory servers [4]. L7 provides order, planning and traceability context. 

The  parallel  branches  require  an  explicit  data-access  mechanism.  Compatible 

shared-input  configurations  [5]  and  dedicated  acquisition  channels  supply 
monitoring data while preserving control ownership. An backup process controller 
(PLC) can be added to ensure fault tolerance by passive hardware redundancy. The 
reads  must  be  bounded,  and  monitoring  services  have  no  priority  over  safety 

background image

 
 

36 

Ionuț

-

Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA

 

 

 

functions or actuator commands; process control is thus decoupled from production 
line monitoring (resources, products, real time product execution orders). 

2.3.

 

Edge acquisition and station-specific processing 

A dedicated edge node is proposed for each zone (Table 1). Its tasks are multi-

rate acquisition, time alignment, primary processing and local buffering. Samples 
retain  source  timestamps,  engineering  units,  quality  status  and  asset  identifiers. 
IEEE 1588 provides the clock-synchronization framework [6]; the actual timestamp 
accuracy  depends  on  the  acquisition  hardware  and  network  configuration. 
Resampling a signal must add to previous acquisition operations for trend estimate.  

Table 1. Two instances of the common edge processing structure 

Station

 

Measurements

 

Edge outputs

 

Robotic assembly. 
Two ABB IRB 
6700 robots 

Two insertion-force channels; 250 Hz 
bursts; four joining points 

RMS force and force

–

insertion 

depth envelopes 

Robotic assembly 

Vacuum, encoders and robot states 

Cycle context and drift events 

Product testing 

Earth continuity, insulation, dielectric 
strength, leakage current and power 

Five test results linked to each 
unit 

Product testing 

Gas-leak event; thermocouples at 1 
sample/s in 16 test positions 

Alarm events, temperature 
history and unit verdict 

At  assembly  cell  level,  root-mean-square  values  and  insertion  envelopes 

summarize each operation. An exponentially weighted moving average (EWMA) 
tracks  changes  in  these  features  over  successive  cycles.  A  force  trace  becomes 
useful for wear monitoring only when comparable joining operations are aligned 
by cycle and position; mixing different products or insertion depths can generate a 
misleading trend. 

At the test station, the edge node associates the sequence and verdict of each test 

with the product identifier. The proposed 50 ppm gas-leak event threshold is an 
engineering setting requiring confirmation for the detector, gas and test procedure. 
However, It is not a universal acceptance limit for household appliances. 

Raw  bursts  and  low-rate  histories  serve  different  purposes.  At  250  Hz  the 

Nyquist frequency is 125 Hz, so this configuration cannot support every bearing-
vibration  diagnostic.  Higher-frequency  analysis  requires  suitable  sensors,  anti-
aliasing  and  faster  acquisition.  Local  buffering  retains  records  during  an  uplink 
outage; forwarding resumes with source timestamps and duplicate handling. Event-

background image

 

 

 

 

Design of an Integrated Monitoring System for a Flow-Shop Production Line 

37

 

 

triggered  raw  bursts  need  a  retention  policy  separate  from  the  one-second 
supervisory history. 

2.4.

 

Communication topology and availability 

The  proposed  network  combines  local  PROFINET  rings  with  a  redundant 

Ethernet core (Figure 3). Each zone has a separate subnet, 10.40.N.0/24, and VLAN 
100+N, for N from 1 to 17. Addresses .10, .11 and .12 respectively identify the 
PLC, acquisition  agent and edge  node;  field-I/O addresses start  at  .21. The core 
occupies VLAN 100. 

 

Figure 3. Logical network topology with redundant core paths and zone subnets 

The  control  path  has  a  configured  PROFINET  IO  RT  cycle  of  4  ms.  MRP 

provides ring recovery for its specified single-failure cases [7]. The design uses a 
recovery  target  below  200  ms  and  a  supervisory  server  takeover  value  of 
approximately 1.8 s through virtual address 10.40.0.40. These values require hard-
ware  measurements;  they  are  not  established  as  field  results.  Ring  recovery  can 
interrupt  traffic,  so  watchdog  settings  are  assessed  independently  of  the  normal 
cycle time. 

Redundant servers, core paths and UPS units improve availability, but individual 

sensors, PLCs and edge nodes remain possible local failure points. Dual attachment 
requires  supported  interfaces  and  a  configured  loop-prevention  or  redundancy 
mechanism. VLAN separation also requires access restrictions and authenticated 
communication to contribute to the security objectives of IEC 62443 [8]. 

background image

 
 

38 

Ionuț

-

Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA

 

 

 

2.5.

 

Equipment and data-volume sizing 

Table 2 summarizes the proposed equipment classes. The common structure is 

instantiated per zone, with an S7-1214C exception at visual inspection. The edge 
hardware remains a pilot selection. Network roles, interface counts and firmware 
compatibility  were  checked  for  the  selected  devices.  The  data  acquisition  and 
monitoring timing is presented in Table 3. 

Table 2. Principal equipment in the proposed deployment. 

Function

 

Candidate equipment

 

Quantity

 

Supervisory servers 

Dell PowerEdge R650, active and standby 

2 

Core switches / UPS 

SCALANCE XM416-4C / APC SRT 3000 VA 

2 / 2 

Zone acquisition agents 

SIMATIC IPC427E 

17 

Edge aggregation nodes 

Industrial acquisition PC with PTP 

17 

Zone PLCs 

S7-1516-3 PN/DP; one S7-1214C exception 

17 

Zone switches 

SCALANCE XC208 

17 

Distributed I/O islands 

ET200SP, IM155-6 PN HF 

67 

Table 3. Acquisition classes and supervisory retention. 

Data class

 

Acquisition policy

 

Retention or output

 

Fast process data 

25

–

250 samples/s, including 

bursts 

Features and selected raw bursts 

Equipment values 

Typically 1 sample/s 

1 s history for 2 h; 1 min aggregates for 
24 h 

Slow or state data 

Several seconds or on change  Configured values and transitions 

Events / genealogy 

On occurrence 

Complete event records and archives 

The registry-based estimate is 537 published samples/s and approximately 344 

kbit/s  at  the  server.  Their  ratio  implies  about  80  bytes  per  published  sample, 
including the assumed record overhead. This is an effective published rate, not the 
simultaneous sampling of all 2,296 signals. Burst concurrency, protocol framing 
and reconnection traffic require separate capacity allowances. 

The stated historian estimate is approximately 371 MB/day. It is interpreted with 

the  retention  policy:  continuously  saving  344  kbit/s  would instead  require  about 

background image

 

 

 

 

Design of an Integrated Monitoring System for a Flow-Shop Production Line 

39

 

 

3.72 GB/day. Aggregation and storage encoding explain why traffic and retained 
volume require separate calculations. The baseline address registry contains 107 
static  entries;  adding  17  edge  nodes  gives  124  entries  before  any  additional 
management addresses. 

2.6.

 

Monitoring functions and decision support 

For each parameter, the acquisition produces a time-stamped sequence at its 

configured rate. Quality checks precede interpretation: an absent or invalid sample 
must  be  marked  unavailable.  For  a  valid  value  x,  instantaneous  conformity  is 
defined by the permitted interval [L, H]: 

 

𝑣(𝑥)   =  1  𝑖𝑓  𝐿  ≤  𝑥  ≤  𝐻;     𝑣(𝑥)   =  0  𝑜𝑡ℎ𝑒𝑟𝑤𝑖𝑠𝑒.

 

(1) 

The  prototype  adds  a  3  s  persistence  delay  and  a  2%  deadband  to  suppress 

transient and chattering indications. The deadband reference have been configured 
per signal. These are application settings; alarm-management standards specify a 
lifecycle for alarm design and response [9], which represent dedicated values for 
these parameters. 

 

𝑧

𝑡

  =  𝜆𝑥

𝑡

  +   (1  −  𝜆)𝑧

𝑡−1

,    𝑧

0

  =  𝜇.

 

(2) 

 

|𝑧

𝑡

  −  𝜇|   >  𝑘𝜎√

𝜆

2 − 𝜆

,    𝜆  =  0.2,   𝑘  =  3.

 

(3) 

Equations (2, 3) implement Exponentially Weighted Moving Average (EWMA) 

drift detection with the asymptotic control limit [10]. The reference mean μ and 
standard  deviation  σ  must  come  from  representative  healthy  operation.  Auto

-

correlation, startup transients and changes  of recipe  affect false-alarm  behaviour 
and therefore require calibration. 

 

𝑠  =  100 𝑐𝑙𝑖𝑝

[0,1]

(1  −  

𝑥 − 𝑥

𝑛𝑜𝑚

𝑥

𝑐𝑟𝑖𝑡

 − 𝑥

𝑛𝑜𝑚

).

 

(4) 

 

𝑅𝑈𝐿  =  𝑚𝑎𝑥(0,

𝑥

𝑐𝑟𝑖𝑡

 − 𝑥

𝑛𝑜𝑤

𝑎

),    𝑎  >  0,   𝑅

2

  >  0.3.

 

(5) 

The subscripts nom, crit and now denote nominal, critical and current values. 

The  health  score  in  (4)  is  clipped  to  [0,  100]  for  increasing  degradation  with  a 
critical value above the nominal value. Equation (5) extrapolates a fitted positive 
slope  a.  The  R²  >  0.3  rule  is  a  prototype  eligibility  check,  not  a  confidence 
guarantee. Unstable trends require an unavailable estimate. ISO 13374 provides the 
broader processing framework [11]. 

 

𝑂𝐸𝐸  =  𝐴  ·  𝑃  ·  𝑄.

 

(6) 

background image

 
 

40 

Ionuț

-

Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA

 

 

 

Availability A, performance P and quality Q require a common asset boundary 

and  accounting  period  [12].  Recommendations  concern  parameter  adjustment, 
maintenance timing or component replacement. Each intervention remains subject 
to the authorized maintenance and control procedures; a predicted remaining life 
does not itself authorize a control action. 

2.7.

 

Monitoring software 

The software mirrors the monitoring path through a publish-subscribe event bus 

(Figure 4). Zone sources publish samples, cycle records and events. Independent 
services  compute alarms,  health  estimates  and  production indicators  or  maintain 
history. The operator interface navigates from the line map to station and signal 
detail, following the HMI design framework of ISA-101 [13]. 

 

Figure 4. Monitoring services and operator access through a common event interface 

Failure  isolation  depends  on  bounded  queues,  independent  execution  and 

explicit retry policies. Publishing alone does not guarantee service independence. 
The data contract preserves the source time, sequence identifiers and quality flags 
through buffering and replay. Replacing simulator sources with industrial adapters 
can  then  preserve  the  service  interfaces,  although  timing,  security  and  hardware 
integration still need commissioning. 

2.8.

 

Simulation protocol 

The proposed simulation represents the complete line, including degradation and 

injectable faults. Structural checks cover all 17 zones and the generated equipment 
and address configuration. The paired maintenance experiment uses an eight-hour 
horizon, the same random seed and the same four injected degradations. Policy A 

background image

 

 

 

 

Design of an Integrated Monitoring System for a Flow-Shop Production Line 

41

 

 

intervenes after failure, with modelled corrective durations of 90

–

180 min. Policy 

B intervenes at the first monitoring alert, with planned durations of 15

–

30 min. 

The comparison combines earlier intervention with shorter assumed repairs; it 

does  not  isolate  prediction  accuracy.  A  matched  seed  improves  comparability. 
Statistical  evaluation  requires  repeated  scenarios,  equivalent  initial  work  in 
progress and exported event logs. 

3.

 

Results and discussion 

Table 4 reports the paired simulation outcome. The finished output increases by 

173  units  from  25  to  198,  which  is  a  692%  relative  increase  over  the  severely 
disrupted reactive case. Unplanned stoppage falls by 159 min. These values support 
the operational relevance of acting before an injected fault blocks the flow; they do 
not establish an expected industrial improvement of the same magnitude. 

Table 4. Eight-hour reactive and alert-triggered maintenance scenario. 

Indicator

 

Reactive A

 

Predictive B

 

Difference

 

Finished units 

25 

198 

+173 (+692%) 

Reported OEE indicator 

43.0% 

53.6% 

+10.6 pp 

Unplanned stoppage 

159 min 

0 min 

−159 min

 

Reported maintenance time 

546 min 

~90 min 

~456 min lower 

Modeled losses 

19,666 RON 

3,780 RON 

−15,886 RON

 

The  OEE  values  require  an  explicit  accounting  definition.  With  the  usual 

common-boundary decomposition, OEE reduces to good output multiplied by ideal 
cycle time and divided by planned production time. If 60 s is treated as the ideal 
cycle and the full 480 min as planned time, the two finished-unit counts correspond 
to 5.2% and 41.3%, respectively. They therefore cannot independently reproduce 
the  reported  43.0%  and  53.6%.  Different  asset  aggregation,  production-time 
exclusions  or  counters  may  explain  the  discrepancy,  but  the  event  records  and 
component factors are required to determine which interpretation applies. 

The 546 min maintenance entry also exceeds the eight-hour observation horizon. 

It cannot represent non-overlapping elapsed downtime of the whole line within that 
shift.  Its  resource  and  time  basis  must  be  reconciled  before  interpreting  the 
approximate  6.1:1  ratio  as  an  operational  saving.  The  cost  difference  is 
approximately 80.8% of the reactive loss, but remains a result of the simulation cost 

background image

 
 

42 

Ionuț

-

Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA

 

 

 

model.  Accounting  calibration  and  implementation  costs  are  outside  this 
comparison. 

The structural result is narrower: the configured architecture was checked across 

17 out of 17 zones. This supports reuse of the zone pattern. It does not validate field 
timing, fault diagnosis or prognostic calibration. The next experiment will record 
alarm lead time, missed and false alerts, maintenance intervals and product-flow 
events over repeated scenarios, followed by a shadow-mode pilot on the robotic 
assembly station. 

4.

 

Conclusions 

The proposed system organizes line monitoring around a common zone interface 

and a dedicated edge path. The simulation illustrates how early maintenance can 
preserve flow under injected degradation, while the metric-accounting issues limit 
quantitative conclusions. A physical pilot must establish timing, sensing adequacy 
and  prediction  quality.  Further  development  will  associate  assets  with  Asset 
Administration Shells [14] and map resource, product, order and expert roles to a 
holonic  structure  [15].  These  extensions  should  preserve  control  ownership  and 
make condition information traceable to the monitored resource and product. 

REFERENCES

 

[1]  A.  K.  S.  Jardine,  D.  Lin,  D.  Banjevic,  A  review  on  machinery  diagnostics  and  prognostics 

implementing condition-based  maintenance, Mechanical Systems and  Signal Processing, 

20

 

(7), 1483

–

1510, 2006. doi: 10.1016/j.ymssp.2005.09.012

 

[2]  T.  Borangiu,  D.  Trentesaux,  A.  Thomas,  P.  Leitão,  J.  Barata,  Digital  transformation  of 

manufacturing through cloud services and resource virtualization, Computers in Industry, Vol. 
108, pp. 150

–

162, 2019. doi: 10.1016/j.compind.2019.01.006

 

[3] IEC 62264-1:2013, Enterprise-control system integration - Part 1: Models and terminology

 

[4] IEC 62541-1:2025, OPC unified architecture - Part 1: Overview and concepts

 

[5] Siemens, Module-internal shared input/shared output (MSI/MSO), SIMATIC documentation, 

accessed 5 September 2026

 

[6]  IEEE  Std  1588-2019,  IEEE  Standard  for  a  Precision  Clock  Synchronization  Protocol  for 

Networked Measurement and Control Systems, published 2020

 

[7] IEC 62439-2:2021, Industrial communication networks. High availability automation networks 

- Part 2: MRP

, 

https://www.vde-verlag.de/p/normen/iec-62439-2-2021/250579-BI-PDF 

[8] IEC 62443-3-3:2013, Industrial communication networks. Network and system security - Part 

3-3: System security requirements and security levels

, 

https://www.iecee.org/certification/iec-

standards/iec-62443-3-32013 

[9] IEC 62682:2022, Management of alarm systems for the process industries

 

background image

 

 

 

 

Design of an Integrated Monitoring System for a Flow-Shop Production Line 

43

 

 

[10]  NIST/SEMATECH,  e-Handbook  of  Statistical  Methods,  Section  6.3.1.4,  EWMA  Control 

Charts, accessed 20 September 2026

 

[11]  ISO  13374-1:2003,  Condition  monitoring  and  diagnostics  of  machines 

—

  Data  processing, 

communication and presentation - Part 1: General guidelines

 

[12] ISO 22400-2:2014, Automation systems and integration. Key performance indicators (KPIs) 

for manufacturing operations management - Part 2: Definitions and descriptions

 

[13] ANSI/ISA-101.01-2015, Human Machine Interfaces for Process Automation Systems

 

[14]  IEC  63278-1:2023,  Asset  Administration  Shell  for  industrial  applications  -  Part  1:  Asset 

Administration Shell structure

, 

https://webstore.iec.ch/en/publication/65628 

[15] H. Van Brussel, J. Wyns, P. Valckenaers, L. Bongaerts, P. Peeters, Reference architecture for 

holonic manufacturing systems: PROSA, Computers in Industry, 

37

(3), pp. 255

–

274, 1998. 

doi: 10.1016/S0166-3615(98)00102-X