Abstract.
The paper proposes an integrated monitoring system for a household-appliance
flow-shop line with 17 zones and 687 conveyors. A dedicated edge processing zone
separates multi-rate acquisition and condition analysis from automatic process control.
The design combines zone agents, redundant supervision, configuration-based network
sizing and independent monitoring services. An eight-hour simulation compares reactive
and alert-triggered maintenance under four matched injected degradations. Finished
output rises from 25 to 198 units in this scenario. The comparison demonstrates the
potential of early intervention, while metric-accounting limitations and the absence of field
validation constrain its interpretation. A physical pilot is the next validation stage.
Keywords:
Flow-shop production; condition monitoring; edge computing; predictive
maintenance; industrial simulation.
10.56082/annalsarsciinfo.2026.2.33
1.
Introduction
In a conveyor-connected flow-shop organisation, the impact of a defect depends
on its position in the material flow. A stopped conveyor can block upstream stations
and starve downstream operations. Machine monitoring therefore needs a line-level
view of product movement, equipment condition and maintenance priorities. This
information must remain available without delaying the control tasks that sequence
production.
Condition-based maintenance connects data acquisition and processing to
decisions about necessary interventions [1]. Digital manufacturing architectures use
mechanisms that integrate physical resources with software services and enterprise
information [2]. For an existing assembly line, the design problem is to make these
mechanisms consistent across heterogeneous stations while maintaining the
deterministic behaviour of the installed automation system.
This paper develops a monitoring structure for 17 production zones, separating
control from edge processing and linking a configuration-driven communication
model to executable monitoring functions. The architectural design is evaluated by
1
Ph.D. student, POLITEHNICA Bucharest, ionut.cristea1507@stud.acs.upb.ro
2
University Professor, Ph.D., POLITEHNICA Bucharest, Academy of Romanian Scientists,
theodor.borangiu@upb.ro
3
Associate Professor, Ph.D., POLITEHNICA Bucharest, silviu.raileanu@upb.ro
4
Ph.D. student, POLITEHNICA Bucharest, andrei.cristea2107@upb.ro
34
Ionuț
-
Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA
help of a paired simulation experiment. The numerical results apply to the simulated
scenario; industrial deployment and prognostic accuracy remain subjects for the
physical pilot development.
2.
Material and method
2.1.
The production line and monitoring requirements
The studied case concerns a household-appliance assembly line with a nominal
takt of 60 s, corresponding to one completed unit (final product) per minute under
nominal operating conditions. Its 17 zones comprise 12 production stations, visual
inspection, long-duration testing, two carrier-return sections and the finished-
product warehouse. The transport system contains 687 conveyors. The product
carriers travel in a closed loop, while approximately 7% of production enters a two-
hour test branch. Figure 1 presents the main and auxiliary routes of the line model.
Figure 1. Production flow with auxiliary test and empty-carrier routes
These routes generate monitoring requirements beyond station alarms. The
product identity must remain linked to the carrier, test verdict and processing
history. The conveyor condition must be interpreted in the context of blocking and
starvation states. The acquisition design must also accommodate dynamic force
signals during active compliant product assembling with robots, slowly changing
temperatures and discrete product-test events within the same zone interface.
The data acquisition configuration contains 67 distributed I/O islands and 2,296
monitored signals. A zone is the individual unit of instrumentation deployment; its
signal registry defines the sensors, IoT gateways and aggregation nodes, sampling
policies, limits and asset identifiers needed by the common monitoring services.
Design of an Integrated Monitoring System for a Flow-Shop Production Line
35
2.2.
Functional architecture and control separation
The proposed monitoring architecture comprises seven functional layers L1-L7
at each workstation as shown in Figure 2. These are data-specific equipment layers.
They are not fully mapped to the ISA-95 hierarchy: manufacturing execution
(MES) and enterprise planning (ERP) are mainly related to the supervision of
operations and batch planning domains described in IEC 62264-1 [3], although both
are fed with current product and resource data collected at monitoring time.
Figure 2. Seven equipment layers with parallel control and product monitoring paths
Distributed sensors feed I/O zones (IoT gateways) on L1, L2 layers. The PLC
zone on L3 layer executes operation sequencing, actuating commands and inter-
locks based on collected process data, while the L4 edge aggregation node performs
condition-data acquisition, alignment and preprocessing. The L5 industrial PC layer
combines process context and product features (retrieved from L4) with control data
and PLC status (retrieved from L3) and exposes an OPC UA interface to the L6
supervisory servers [4]. L7 provides order, planning and traceability context.
The parallel branches require an explicit data-access mechanism. Compatible
shared-input configurations [5] and dedicated acquisition channels supply
monitoring data while preserving control ownership. An backup process controller
(PLC) can be added to ensure fault tolerance by passive hardware redundancy. The
reads must be bounded, and monitoring services have no priority over safety
36
Ionuț
-
Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA
functions or actuator commands; process control is thus decoupled from production
line monitoring (resources, products, real time product execution orders).
2.3.
Edge acquisition and station-specific processing
A dedicated edge node is proposed for each zone (Table 1). Its tasks are multi-
rate acquisition, time alignment, primary processing and local buffering. Samples
retain source timestamps, engineering units, quality status and asset identifiers.
IEEE 1588 provides the clock-synchronization framework [6]; the actual timestamp
accuracy depends on the acquisition hardware and network configuration.
Resampling a signal must add to previous acquisition operations for trend estimate.
Table 1. Two instances of the common edge processing structure
Station
Measurements
Edge outputs
Robotic assembly.
Two ABB IRB
6700 robots
Two insertion-force channels; 250 Hz
bursts; four joining points
RMS force and force
–
insertion
depth envelopes
Robotic assembly
Vacuum, encoders and robot states
Cycle context and drift events
Product testing
Earth continuity, insulation, dielectric
strength, leakage current and power
Five test results linked to each
unit
Product testing
Gas-leak event; thermocouples at 1
sample/s in 16 test positions
Alarm events, temperature
history and unit verdict
At assembly cell level, root-mean-square values and insertion envelopes
summarize each operation. An exponentially weighted moving average (EWMA)
tracks changes in these features over successive cycles. A force trace becomes
useful for wear monitoring only when comparable joining operations are aligned
by cycle and position; mixing different products or insertion depths can generate a
misleading trend.
At the test station, the edge node associates the sequence and verdict of each test
with the product identifier. The proposed 50 ppm gas-leak event threshold is an
engineering setting requiring confirmation for the detector, gas and test procedure.
However, It is not a universal acceptance limit for household appliances.
Raw bursts and low-rate histories serve different purposes. At 250 Hz the
Nyquist frequency is 125 Hz, so this configuration cannot support every bearing-
vibration diagnostic. Higher-frequency analysis requires suitable sensors, anti-
aliasing and faster acquisition. Local buffering retains records during an uplink
outage; forwarding resumes with source timestamps and duplicate handling. Event-
Design of an Integrated Monitoring System for a Flow-Shop Production Line
37
triggered raw bursts need a retention policy separate from the one-second
supervisory history.
2.4.
Communication topology and availability
The proposed network combines local PROFINET rings with a redundant
Ethernet core (Figure 3). Each zone has a separate subnet, 10.40.N.0/24, and VLAN
100+N, for N from 1 to 17. Addresses .10, .11 and .12 respectively identify the
PLC, acquisition agent and edge node; field-I/O addresses start at .21. The core
occupies VLAN 100.
Figure 3. Logical network topology with redundant core paths and zone subnets
The control path has a configured PROFINET IO RT cycle of 4 ms. MRP
provides ring recovery for its specified single-failure cases [7]. The design uses a
recovery target below 200 ms and a supervisory server takeover value of
approximately 1.8 s through virtual address 10.40.0.40. These values require hard-
ware measurements; they are not established as field results. Ring recovery can
interrupt traffic, so watchdog settings are assessed independently of the normal
cycle time.
Redundant servers, core paths and UPS units improve availability, but individual
sensors, PLCs and edge nodes remain possible local failure points. Dual attachment
requires supported interfaces and a configured loop-prevention or redundancy
mechanism. VLAN separation also requires access restrictions and authenticated
communication to contribute to the security objectives of IEC 62443 [8].
38
Ionuț
-
Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA
2.5.
Equipment and data-volume sizing
Table 2 summarizes the proposed equipment classes. The common structure is
instantiated per zone, with an S7-1214C exception at visual inspection. The edge
hardware remains a pilot selection. Network roles, interface counts and firmware
compatibility were checked for the selected devices. The data acquisition and
monitoring timing is presented in Table 3.
Table 2. Principal equipment in the proposed deployment.
Function
Candidate equipment
Quantity
Supervisory servers
Dell PowerEdge R650, active and standby
2
Core switches / UPS
SCALANCE XM416-4C / APC SRT 3000 VA
2 / 2
Zone acquisition agents
SIMATIC IPC427E
17
Edge aggregation nodes
Industrial acquisition PC with PTP
17
Zone PLCs
S7-1516-3 PN/DP; one S7-1214C exception
17
Zone switches
SCALANCE XC208
17
Distributed I/O islands
ET200SP, IM155-6 PN HF
67
Table 3. Acquisition classes and supervisory retention.
Data class
Acquisition policy
Retention or output
Fast process data
25
–
250 samples/s, including
bursts
Features and selected raw bursts
Equipment values
Typically 1 sample/s
1 s history for 2 h; 1 min aggregates for
24 h
Slow or state data
Several seconds or on change Configured values and transitions
Events / genealogy
On occurrence
Complete event records and archives
The registry-based estimate is 537 published samples/s and approximately 344
kbit/s at the server. Their ratio implies about 80 bytes per published sample,
including the assumed record overhead. This is an effective published rate, not the
simultaneous sampling of all 2,296 signals. Burst concurrency, protocol framing
and reconnection traffic require separate capacity allowances.
The stated historian estimate is approximately 371 MB/day. It is interpreted with
the retention policy: continuously saving 344 kbit/s would instead require about
Design of an Integrated Monitoring System for a Flow-Shop Production Line
39
3.72 GB/day. Aggregation and storage encoding explain why traffic and retained
volume require separate calculations. The baseline address registry contains 107
static entries; adding 17 edge nodes gives 124 entries before any additional
management addresses.
2.6.
Monitoring functions and decision support
For each parameter, the acquisition produces a time-stamped sequence at its
configured rate. Quality checks precede interpretation: an absent or invalid sample
must be marked unavailable. For a valid value x, instantaneous conformity is
defined by the permitted interval [L, H]:
𝑣(𝑥) = 1 𝑖𝑓 𝐿 ≤ 𝑥 ≤ 𝐻; 𝑣(𝑥) = 0 𝑜𝑡ℎ𝑒𝑟𝑤𝑖𝑠𝑒.
(1)
The prototype adds a 3 s persistence delay and a 2% deadband to suppress
transient and chattering indications. The deadband reference have been configured
per signal. These are application settings; alarm-management standards specify a
lifecycle for alarm design and response [9], which represent dedicated values for
these parameters.
𝑧
𝑡
= 𝜆𝑥
𝑡
+ (1 − 𝜆)𝑧
𝑡−1
, 𝑧
0
= 𝜇.
(2)
|𝑧
𝑡
− 𝜇| > 𝑘𝜎√
𝜆
2 − 𝜆
, 𝜆 = 0.2, 𝑘 = 3.
(3)
Equations (2, 3) implement Exponentially Weighted Moving Average (EWMA)
drift detection with the asymptotic control limit [10]. The reference mean μ and
standard deviation σ must come from representative healthy operation. Auto
-
correlation, startup transients and changes of recipe affect false-alarm behaviour
and therefore require calibration.
𝑠 = 100 𝑐𝑙𝑖𝑝
[0,1]
(1 −
𝑥 − 𝑥
𝑛𝑜𝑚
𝑥
𝑐𝑟𝑖𝑡
− 𝑥
𝑛𝑜𝑚
).
(4)
𝑅𝑈𝐿 = 𝑚𝑎𝑥(0,
𝑥
𝑐𝑟𝑖𝑡
− 𝑥
𝑛𝑜𝑤
𝑎
), 𝑎 > 0, 𝑅
2
> 0.3.
(5)
The subscripts nom, crit and now denote nominal, critical and current values.
The health score in (4) is clipped to [0, 100] for increasing degradation with a
critical value above the nominal value. Equation (5) extrapolates a fitted positive
slope a. The R² > 0.3 rule is a prototype eligibility check, not a confidence
guarantee. Unstable trends require an unavailable estimate. ISO 13374 provides the
broader processing framework [11].
𝑂𝐸𝐸 = 𝐴 · 𝑃 · 𝑄.
(6)
40
Ionuț
-
Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA
Availability A, performance P and quality Q require a common asset boundary
and accounting period [12]. Recommendations concern parameter adjustment,
maintenance timing or component replacement. Each intervention remains subject
to the authorized maintenance and control procedures; a predicted remaining life
does not itself authorize a control action.
2.7.
Monitoring software
The software mirrors the monitoring path through a publish-subscribe event bus
(Figure 4). Zone sources publish samples, cycle records and events. Independent
services compute alarms, health estimates and production indicators or maintain
history. The operator interface navigates from the line map to station and signal
detail, following the HMI design framework of ISA-101 [13].
Figure 4. Monitoring services and operator access through a common event interface
Failure isolation depends on bounded queues, independent execution and
explicit retry policies. Publishing alone does not guarantee service independence.
The data contract preserves the source time, sequence identifiers and quality flags
through buffering and replay. Replacing simulator sources with industrial adapters
can then preserve the service interfaces, although timing, security and hardware
integration still need commissioning.
2.8.
Simulation protocol
The proposed simulation represents the complete line, including degradation and
injectable faults. Structural checks cover all 17 zones and the generated equipment
and address configuration. The paired maintenance experiment uses an eight-hour
horizon, the same random seed and the same four injected degradations. Policy A
Design of an Integrated Monitoring System for a Flow-Shop Production Line
41
intervenes after failure, with modelled corrective durations of 90
–
180 min. Policy
B intervenes at the first monitoring alert, with planned durations of 15
–
30 min.
The comparison combines earlier intervention with shorter assumed repairs; it
does not isolate prediction accuracy. A matched seed improves comparability.
Statistical evaluation requires repeated scenarios, equivalent initial work in
progress and exported event logs.
3.
Results and discussion
Table 4 reports the paired simulation outcome. The finished output increases by
173 units from 25 to 198, which is a 692% relative increase over the severely
disrupted reactive case. Unplanned stoppage falls by 159 min. These values support
the operational relevance of acting before an injected fault blocks the flow; they do
not establish an expected industrial improvement of the same magnitude.
Table 4. Eight-hour reactive and alert-triggered maintenance scenario.
Indicator
Reactive A
Predictive B
Difference
Finished units
25
198
+173 (+692%)
Reported OEE indicator
43.0%
53.6%
+10.6 pp
Unplanned stoppage
159 min
0 min
−159 min
Reported maintenance time
546 min
~90 min
~456 min lower
Modeled losses
19,666 RON
3,780 RON
−15,886 RON
The OEE values require an explicit accounting definition. With the usual
common-boundary decomposition, OEE reduces to good output multiplied by ideal
cycle time and divided by planned production time. If 60 s is treated as the ideal
cycle and the full 480 min as planned time, the two finished-unit counts correspond
to 5.2% and 41.3%, respectively. They therefore cannot independently reproduce
the reported 43.0% and 53.6%. Different asset aggregation, production-time
exclusions or counters may explain the discrepancy, but the event records and
component factors are required to determine which interpretation applies.
The 546 min maintenance entry also exceeds the eight-hour observation horizon.
It cannot represent non-overlapping elapsed downtime of the whole line within that
shift. Its resource and time basis must be reconciled before interpreting the
approximate 6.1:1 ratio as an operational saving. The cost difference is
approximately 80.8% of the reactive loss, but remains a result of the simulation cost
42
Ionuț
-
Valentin CRISTEA, Theodor BORANGIU, Silviu RĂILEANU, Andrei Alexandru CRISTEA
model. Accounting calibration and implementation costs are outside this
comparison.
The structural result is narrower: the configured architecture was checked across
17 out of 17 zones. This supports reuse of the zone pattern. It does not validate field
timing, fault diagnosis or prognostic calibration. The next experiment will record
alarm lead time, missed and false alerts, maintenance intervals and product-flow
events over repeated scenarios, followed by a shadow-mode pilot on the robotic
assembly station.
4.
Conclusions
The proposed system organizes line monitoring around a common zone interface
and a dedicated edge path. The simulation illustrates how early maintenance can
preserve flow under injected degradation, while the metric-accounting issues limit
quantitative conclusions. A physical pilot must establish timing, sensing adequacy
and prediction quality. Further development will associate assets with Asset
Administration Shells [14] and map resource, product, order and expert roles to a
holonic structure [15]. These extensions should preserve control ownership and
make condition information traceable to the monitored resource and product.
REFERENCES
[1] A. K. S. Jardine, D. Lin, D. Banjevic, A review on machinery diagnostics and prognostics
implementing condition-based maintenance, Mechanical Systems and Signal Processing,
1510, 2006. doi: 10.1016/j.ymssp.2005.09.012
[2] T. Borangiu, D. Trentesaux, A. Thomas, P. Leitão, J. Barata, Digital transformation of
162, 2019. doi: 10.1016/j.compind.2019.01.006
[3] IEC 62264-1:2013, Enterprise-control system integration - Part 1: Models and terminology
[4] IEC 62541-1:2025, OPC unified architecture - Part 1: Overview and concepts
[5] Siemens, Module-internal shared input/shared output (MSI/MSO), SIMATIC documentation,
[6] IEEE Std 1588-2019, IEEE Standard for a Precision Clock Synchronization Protocol for
Networked Measurement and Control Systems, published 2020
[7] IEC 62439-2:2021, Industrial communication networks. High availability automation networks
https://www.vde-verlag.de/p/normen/iec-62439-2-2021/250579-BI-PDF
[8] IEC 62443-3-3:2013, Industrial communication networks. Network and system security - Part
3-3: System security requirements and security levels
https://www.iecee.org/certification/iec-
standards/iec-62443-3-32013
[9] IEC 62682:2022, Management of alarm systems for the process industries
Design of an Integrated Monitoring System for a Flow-Shop Production Line
43
[10] NIST/SEMATECH, e-Handbook of Statistical Methods, Section 6.3.1.4, EWMA Control
Charts, accessed 20 September 2026
[11] ISO 13374-1:2003, Condition monitoring and diagnostics of machines
communication and presentation - Part 1: General guidelines
[12] ISO 22400-2:2014, Automation systems and integration. Key performance indicators (KPIs)
for manufacturing operations management - Part 2: Definitions and descriptions
[13] ANSI/ISA-101.01-2015, Human Machine Interfaces for Process Automation Systems
[14] IEC 63278-1:2023, Asset Administration Shell for industrial applications - Part 1: Asset
Administration Shell structure
https://webstore.iec.ch/en/publication/65628
[15] H. Van Brussel, J. Wyns, P. Valckenaers, L. Bongaerts, P. Peeters, Reference architecture for
holonic manufacturing systems: PROSA, Computers in Industry,